Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Mobile Plant (Tipper & Tag-along Trailer) SWMS 10452-1

Mobile Plant (Tipper & Tag-along Trailer) SWMS 10452-1

Product SKU: 10452
Mobile Plant (Tipper & Tag-along Trailer) SWMS 10452-1 Video

Other Details

PDF Download:
Mobile Plant (tipper_tag-along trailer) SWMS 10452-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • Fully customisable so you can add your logo and any site specific details
  • Customising Instructions provided
  • You must have Microsoft Word or iAuditor to use this template

Mobile Plant (Tipper & Tag-along Trailer) Safe Work Method Statement

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associateed with the safe operation of a tip truck, including side tippers and associated use of a tag-along trailer carrying earthmoving equipment such as skidsteers etc.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Mobile Plant (Tipper & Tag-along Trailer) SWMS Content: 

  • Hazardous Work
    • Mobile Plant
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    1. Planning & Preparation
    2. Training and Capabilities
    3. Coupling / uncoupling trailers
    4. Pick-up / set down of mobile plant
    5. Travel to & between sites transporting the load
    6. Arrival onsite
    7. Tipper operatation onsite
    8. Loading / unloading spoil
    9. Refuelling 
    10. On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...