Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Mobile Plant (Tractor Slashing) SWMS 10275-4

Mobile Plant (Tractor Slashing) SWMS 10275-4

Product SKU: 10275
Mobile Plant (Tractor Slashing) SWMS 10275-4 Video

Other Details

PDF Download:
mobile_plant_tractor_slashing_swms_10__87206_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Tractor Slashing - Mobile Plant Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the operation of a tractor for slashing properties and roadside verges. Also covered in this SWMS are the use of slashing, bucket, post driver and other attachments. Tractor pre-start checklist included.

Job Steps Covered in Tractor Slashing - Mobile Plant SWMS:

 (includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess onsite conditions
  4. Delivery and removal of tractor
  5. Worker consultation
  6. Pre start check
  7. Prepare intended work site
  8. Entering or exiting cabin
  9. Tractor operation
  10. Slasher attachment
  11. Changing attachments
  12. When working outside of tractor / cabin
  13. Maintenance on site
  14. Refuelling on site
  15. On Completion
  16. Avoiding tractor roll-over


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...