Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Pest Control (Feral Animal Culling) SWMS 10620-1

Pest Control (Feral Animal Culling) SWMS 10620-1

Product SKU: 10620
Pest Control (Feral Animal Culling) SWMS 10620-1 Video

Other Details

PDF Download:
Pest Control (feral animal culling) SWMS 10620-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Pest Control (Feral Animal Culling) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) covers the general hazards for shooting feral animals. Included in this SWMS is planning and preparation, training, transporting firearms & ammunition, firearm safety and post shot animal control. 

Examples of feral animals: wild boar, deer, rabbits, goats, camels, horses, birds etc.

Job Steps Covered in Pest Control (Feral Animal Culling) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Equipment pre-start safety check
  4. Transporting firearms & ammunition
  5. Arrival onsite 
  6. Setup animal dispatch zone and conduct equipment pre-start check
  7. Conduct humane kill
  8. Management of the animal post shot/kill
  9. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...