Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Plumbing Call-out SWMS 10553-4

Plumbing Call-out SWMS 10553-4

Product SKU: 10553
Plumbing Call-out SWMS 10553-4 Video

Other Details

PDF Download:
Plumbing Call-out SWMS 10553-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Plumbing Call-Out Safe Work Method Statement Scope:

This SWMS covers general hazards associated with general plumbing repairs and maintenance. This SWMS includes general work plumbing hazards, working with hot water system/boilers, gas systems and, working at elevated positions.

Job Steps Covered in Plumbing Call-Out SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Travel to, from & between sites
  4. Arrival at site
  5. General repairs i.e. changing washers, replacing taps etc
  6. Working at elevated positions
  7. Hot work - electric or gas welding. Soldering / Cutting
  8. Hot water systems/boilers
  9. Working with gas
  10. Using power tools
  11. Working with Asbestos
  12. On Completion

Click here to view a sample of the Plumbing Call-Out SWMS

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...