Plumbing (pipes-culverts-stormwater tanks) SWMS 10326-4

Plumbing (pipes-culverts-stormwater tanks) SWMS 10326-4

Product SKU: 10326
Plumbing (pipes-culverts-stormwater tanks) SWMS 10326-4 Video

Other Details

PDF Download:
Plumbing_Pipes_culverts_stormwater_tanks_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Plumbing - Pipes - Culverts - Stormwater Tank Safe Work Method Statement

This SWMS provides guidance installation of pipes, concrete culverts and storm water tanks for civil works. This includes the planning, preparation, delivery and operations when installing pipes, culverts and tanks into an excavation. This SWMS includes controls for working in excavations greater than 1.5m deep. Working adjacent to mobile plant and emergency response in case of trench collapse.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Plumbing - Pipes - Culverts - Stormwater Tank SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Working at depths greater than 1.5 metres, including tunnels or mines
    • Work carried out adjacent to a road, railway or shipping lane, traffic corridor
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Implement a site specific Emergency Response Plan
    • Training and Capabilities
    • Assess onsite conditions
    • Set up work area
    • Temporary Traffic Control
    • Delivery of materials (e.g. pipes, culverts, backfill material)
    • Excavating & backfilling - working with machinery
    • Installing & removing trench shields/shoring
    • Excavating ground - water charged ground
    • Working in trenches / pits > 1.5m deep
    • Lifting pipes, culverts, tanks into excavations
    • Fixing pipework, tanks
    • On Completion
  • Emergency Response Plan
  • Emergency Response
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.