Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Plumbing (Pipes - Culverts - Stormwater Tanks) SWMS 10326-6

Plumbing (Pipes - Culverts - Stormwater Tanks) SWMS 10326-6

Product SKU: 10326
Plumbing (Pipes - Culverts - Stormwater Tanks) SWMS 10326-6 Video

Other Details

PDF Download:
Plumbing (pipes-culverts-stormwater tanks) SWMS 10326-6_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Plumbing (Pipes-Culverts-Stormwater Tanks) Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) provides guidance installation of pipes, concrete culverts and storm water tanks for civil works. This includes the planning, preparation, delivery and operations when installing pipes, culverts and tanks into an excavation and working in excavations greater than 1.5m deep. 

Job Steps Covered in Plumbing (Pipes-Culverts-Stormwater Tanks) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival at site 
  4. Set up work area 
  5. Delivery of materials (E.g. pipes, culverts, backfill material)
  6. Excavating & backfilling - working with machinery
  7. Installing & removing trench shields /shoring
  8. Excavating ground – water charged ground
  9. Working in trenches/pits >1.5m deep
  10. Lifting Pipes, culverts, tanks into excavations
  11. Fixing pipework, tanks
  12. On Completion
  13. Record Keeping/ Health Monitoring

Click here to view a sample of the Plumbing (pipes-culverts-stormwater tanks) SWMS

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents. 

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...