Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Plumbing (rough in - final fit out) SWMS 10197-5

Plumbing (rough in - final fit out) SWMS 10197-5

Product SKU: 10197
Plumbing (rough in - final fit out) SWMS 10197-5 Video

Other Details

PDF Download:
Plumbing_roughin-final_fitout_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Plumbing Roughin Final Fitout Safe Work Method Statement

This SWMS covers the safe installation and fitting of pipework, appliances, fixtures for hot / cold water and fire system installation. This includes commercial, industrial and domestic plumbing works from the building line to termination points. 

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.  

Plumbing Roughin Final Fitout SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services 
    • Involves a risk of a person falling more than 2m, including work on telecommunications towers
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    1. Planning & Preparation
    2. Training and Capabilities
    3. Arrival & assess onsite conditions
    4. Unloading / storage of materials
    5. Work area set up
    6. Excavation - Sub surface installation
    7. Hot work - electric or gas welding. Soldering / cutting
    8. Running pipework
    9. Fitting appliances / fixtures
    10. On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring  

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...