Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Plumbing (Water Jetting Drains) SWMS 10555-1

Plumbing (Water Jetting Drains) SWMS 10555-1

Product SKU: 10555
Plumbing (Water Jetting Drains) SWMS 10555-1 Video

Other Details

PDF Download:
Plumbing (water jetting drains) SWMS 10555-2_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Plumbing - Water Jetting Drains Safe Work Method Statement Scope:

This SWMS covers general hazards associated with the operation of a Truck Mounted Hydro-Jet for use in clearing blocked sewers and drains. This includes use of the truck, including pre-start and operational use, traffic and pedestrian control, and use of pressurised equipment.

This SWMS does not include controls for working in a confined space or pit.  A separate, dedicated SWMS must be put in place and utilised for confined space work.

Job Steps Covered in Plumbing - Water Jetting Drains SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Pre start check
    • A truck pre start checklist in included in this SWMS
  4. Truck Operation
  5. Obtaining water from Hydrant or other water source e.g. creek/dam
  6. Assess onsite conditions for jetting operations
  7. Manhole/pit safety
  8. CCTV use
  9. Pumps
  10. Hydro Jetting
  11. Refuelling
  12. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...