Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Pool Maintenance SWMS 10194-4

Pool Maintenance SWMS 10194-4

Product SKU: 10194
Pool Maintenance SWMS 10194-4 Video

Other Details

PDF Download:
Pool Maintenance SWMS 10194-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Pool Maintenance Safe Work Method Statement Scope:

The Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls associated with Pool Maintenance including, filter changes, pump repairs and chemical handling.Covered in this SWMS is planning and preparation, training, transporting chemicals, materials and tools to site, chemical handling and pool cleaning.

Job Steps Covered in Pool Maintenance SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Transporting & Loading Materials
  4. Arrival at Site
  5. Water Testing, Checks, Repairs & Cleaning
  6. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...