Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Power Pole Temporary Support SWMS 10450-1

Power Pole Temporary Support SWMS 10450-1

Product SKU: 10450
Power Pole Temporary Support SWMS 10450-1 Video

Other Details

PDF Download:
Power Pole Temporary Support SWMS 10450-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Power Pole Temporary Support Safe Work Method Statement Scope:

This SWMS covers general hazards associated with supporting a power pole using a crane in the presense of overhead power lines and in close proximity to roads with public vehicular traffic.  Included in this SWMS is controls for working adjacent to powerlines, traffic control, planning, preparation and safe work with mobile plant. Crane prestart checklist included.

Job Steps Covered in Powerpole - Removal - Installation SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival onsite
  4. Site Setup
  5. Select & Inspect Equipment
  6. Pre-operational Assessment
  7. Pole support
  8. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...