Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Pylon Driving SWMS 10608-1

Pylon Driving SWMS 10608-1

Product SKU: 10608
Pylon Driving SWMS 10608-1 Video

Other Details

PDF Download:
pylon_driving_swms_10__52040_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Pylon Driving Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with use of a mobile crane to conduct pylon driving operations. This includes the use of a hydraulic air hammer to drive pylons and pylon sheets. Mobile Crane Pre-start Checklist - Road Travel included.  

Job Steps Covered in Pylon Driving SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Road Operation
  4. Assess Onsite Conditions
  5. Crane Pre-start Check
  6. Site Setup
  7. Establish Communication Between Ground Workers & Crane Operator
  8. Select and Inspect Lifting Equipment
  9. Pre-lift Assessment
  10. Loading/Unloading Plant, Compressor & Equipment from Vehicles
  11. Power Plants/Air Compressors
  12. Crane/Piling Operation
  13. Operation -Attachments
  14. Refueling on Site
  15. Maintenance on Site
  16. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...