Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Rail Corridor (Vegetation Control) SWMS 10569-2

Rail Corridor (Vegetation Control) SWMS 10569-2

Product SKU: 10569
Rail Corridor (Vegetation Control) SWMS 10569-2 Video

Other Details

PDF Download:
Rail_Corridor_Vegetation_Control_SWMS_10569-2_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Rail Corridor - Vegetation Control Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) outlines the general safety steps, hazards and controls associated with vegetation control, using brush cutters, in rail corridors.

Job Steps Covered in Rail Corridor - Vegetation Control SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Travel To, From & Between Sites
  4. Assess Onsite Conditions
  5. Prepare Intended Worksite
  6. Brush Cutting
    • Potential hazards covered:
      • Cuts, lacerations & abrasions
      • Public and other worker safety
      • Slips, trips and falls
      • Contact with reptiles, spiders and insects
      • Contact with hazardous plants
      • Fire
      • Hazardous manual tasks
      • Entanglement
  7. Refuelling on Site
  8. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...