Need a customised SWMS package? Contact us for a free quote or call 1300 306 604
This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the application of cement render to brick and block walls.
Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.
Rendering SWMS Content:
For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.
Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.
Posted by Renée Formosa on 30th Sep 2014
After spending over a week trying to do up my own SWMS for mine and my husbands new business, it was taking up so much time that I didn't have. After having a look at my options online, safety culture was not only great on price but had exactly what I needed and it literally took 5 minutes to buy and print out. I felt very relieved :)
10/10
Thanks guys!