Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Restumping Houses SWMS 10342-3

Restumping Houses SWMS 10342-3

Product SKU: 10342
Restumping Houses SWMS 10342-3 Video

Other Details

PDF Download:
Restumping Houses SWMS 10342-3_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Restumping Houses Safe Work Method Statement Scope:

This SWMS covers the general hazards for the removal of timber stumps and replacing with concrete or steel stumpsThe processes of removal, replacement and excavation are manual and mechanical using jackhammers hand and power tools. Access to stumps is via subfloor or removal of floor boards

Job Steps Covered in Restumping Houses SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Materials delivery & placement
  3. Arrival & assess onsite conditions
  4. Site set up
  5. Jack the house
  6. Remove & replacing stumps & manual excavation of foundations
  7. Setting the stumps
  8. Jack/prop removal
  9. On Completion
  10. Record Keeping/ Health Monitoring

godigital-digitaljsa-bannerforswmspages-v3.png 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...