Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Road Repairs (Asphalt - Concrete) SWMS 10013-6

Road Repairs (Asphalt - Concrete) SWMS 10013-6

Product SKU: 10013
Road Repairs (Asphalt - Concrete) SWMS 10013-6 Video

Other Details

PDF Download:
Road Repairs (asphalt-concrete) SWMS 10013-6_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Road Repairs (Asphalt - Concrete) Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) covers general hazards associated with minor asphalt repairs and application, including setting up safe work zone for short term works in a traffic corridor, the application of hot bitumen / asphalt mix (between 140-200 degrees Celsius) and concrete to roads. 

Job Steps Covered in Road Repairs (Asphalt - Concrete) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Develop site-specific traffic management plan
  4. Arrival & assessment of on-site conditions
  5. Establish safe work zone (site set-up)
  6. Surface repair and application
  7. End of shift    

godigital-digitaljsa-bannerforswmspages-v3.png

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...