Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Roadworks (Shoulder Grading) SWMS 10442-1

Roadworks (Shoulder Grading) SWMS 10442-1

Product SKU: 10442
Roadworks (Shoulder Grading) SWMS 10442-1 Video

Other Details

PDF Download:
Roadworks (shoulder grading) SWMS 10442-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Roadworks (Shoulder Grading) Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with road shoulder grading using a grader, rollers and a water cart. This SWMS covers the planning and preparation of the activity, traffic management and general controls associated with the task.

Job Steps Covered in Roadworks (Shoulder Grading) SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival at Site
  4. Setup Work Area
  5. Grade the Shoulder
  6. Gravel Placement
  7. Compact Shoulder
  8. Loading Spoil
  9. Travel to & Unloading Spoil at Landfill
  10. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...