Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Scissor Lift - Elevated Work Platform (EWP) SWMS 10515.2-3

Scissor Lift - Elevated Work Platform (EWP) SWMS 10515.2-3

Product SKU: 10515.2
Scissor Lift - Elevated Work Platform (EWP) SWMS 10515.2-3 Video

Other Details

PDF Download:
mobile_plant_ewp_swms_10515-2__39178_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Suitable for Cherry Pickers, Boom Lifts, Scissor Lifts, Aerial Work Platforms and Vertical Lifts
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • You must have Microsoft Word or iAuditor to use this template

Scissor Lift Elevated Work Platform (EWP) Safe Work Method Statement

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards and controls associated with the safe operation of Elevated Work Platforms including scissor lifts, boom lifts, cherry pickers, aerial work platforms, articulating booms and vertical lifts.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.  

Scissor Lift Elevated Work Platform (EWP) SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
    • Involves a risk of a person falling more than 2m, including work on telecommunications towers
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Delivery and removal of EWP
    • Arrival & set-up onsite
    • EWP Operation
    • Refuelling on site
    • On Completion 
  • Falls Emergency Rescue Plan
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at. or works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Write your own product review

Product Reviews


  1. EWP SWMS

    Posted by on

    Good package which addresses most issues well.

    Thankfully it wasn't too prescriptive about things such as lanyards being fitted to all handtools and equipment.
    Allows user disgression to close off area below instead.

    Much simpler and more easily understood by the workers than the template & SWM which came from the EWP hirer!!!

    Saved time and got the boys back to work as soon as possible when they were pulled up for not working in accordance with the EWP hirer's SWMS.

    Thanks for making life easier!


$79.95

PLUS GST

View Cart


You May Also Need...