Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Stairs (Balustrade - Handrail) Installation SWMS 10252-4

Stairs (Balustrade - Handrail) Installation SWMS 10252-4

Product SKU: 10252
Stairs (Balustrade - Handrail) Installation SWMS 10252-4 Video

Other Details

PDF Download:
Stairs (balustrade - handrail) Installation SWMS 10252-4_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Stairs, Balustrade & Handrail Installation Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) covers general safety hazards and risks involved with safe installation of stairs, balustrades or handrails. Included in this SWMS is planning and preparation, training and competency requirements, working on ladders and falling objects.

Job Steps Covered in Stairs, Balustrade & Handrail Installation SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival & Site Assessment
  4. Work Area Set-up
  5. Stringer & Stair Installation
  6. Installing Fittings, Balustrade & Rails
  7. On Completion

Click here to view a sample of the Stairs, Balustrade & Handrail Installation SWMS

 

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...