Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604
20% OFF ALL SWMS & SOPS!!!! Ends 5pm 31st July 2017. Enter coupon SAVE20% at checkout.

Swimming Pool Construction SWMS 10

Swimming Pool Construction SWMS 10

Product SKU: 10371
Swimming Pool Construction SWMS 10 Video

Other Details

PDF Download:
SwimmingPoolConstruction_SWMS_10_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Swimming Pool Safe Work Method Statement

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the construction of in-ground concrete pool shells. This includes steel fixing, installing ancillary plumbing, placing formwork and the placement of concrete including shaping of the concrete shell.

This SWMS does not cover the use of excavation machinery, concrete pump or electrical work. Separate, dedicated SWMS will be required for these activities.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

Swimming Pool SWMS Content: 

  • High Risk Construction Work
    • Mobile Plant   
    • Working at depths greater than 1.5 metres, including tunnels or mines
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps (includes potential hazards and control measures)
    • Planning & Preparation
    • Training and Capabilities
    • Assess onsite conditions
    • General Work area set up
    • Delivery of materials (steel reinforcement etc)
    • Setting out / profiling pool
    • Excavating foundations
    • Installing plumbing
    • Setting steel reinforcement
    • Setting formwork
    • Pouring concrete
    • On Completion
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring 

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...