Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Synthetic Grass Laying SWMS 10378-3

Synthetic Grass Laying SWMS 10378-3

Product SKU: 10378
Synthetic Grass Laying SWMS 10378-3 Video

Other Details

PDF Download:
Synthetic Grass Laying_SWMS_10378-3_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Synthetic Grass - Laying Safe Work Method Statement Scope:

This SWMS provides guidance on the preparation and installation of synthetic grass. This will include working with shallow depth excavation of an area, placement and compaction of fill material, preparation and laying of shock pads / synthetic grass and working near powered mobile plant.

Job Steps Covered in Synthetic Grass - Laying SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess onsite conditions
  4. Work area set up
  5. Delivery of materials and mobile plant
  6. Remove existing turf
  7. Preparing subgrade
  8. Grass laying, trimming and seaming
  9. Finishing - Distributing & brooming sand
  10. Refuelling small engine equipment on site (vibrator plates etc.)
  11. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...