Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Tiling (Wall - Floor) SWMS 10267-6

Tiling (Wall - Floor) SWMS 10267-6

Product SKU: 10267
Tiling (Wall - Floor) SWMS 10267-6 Video

Other Details

PDF Download:
Tiling (wall floor) SWMS 10267-6_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Tiling- Wall - Floor - Laying Safe Work Method Statement Scope:

This Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, general hazards and controls associated with the preparation and laying of wall and floor tiling. 

Job Steps Covered in Tiling- Wall - Floor - Laying SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Arrival & assess onsite conditions
  4. Materials delivery
  5. Work area setup
  6. Surface preparation
  7. Mixing & applying adhesives & grout
  8. Cutting & Laying tiles
  9. On Completion

Click here to view a sample of the Tiling- Wall - Floor - Laying SWMS

We're here to help if you need us!

We give you support by calling 1300 306 604 or email info@safetyculture.com.au during business hours.

Feel free to view our Frequently Asked Questions (FAQs) for more information about SWMS or even view one of our Video Tutorials to help you customise your documents.

godigital-digitaljsa-bannerforswmspages-v3.png

Write your own product review

Product Reviews


  1. Everything you need

    Posted by on

    Basically, everything you need in a SWMS made specifically for Tiling works.
    Thanks


$79.95

PLUS GST

View Cart


You May Also Need...