Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Timber Floor Laying SWMS 10182-4

Timber Floor Laying SWMS 10182-4

Product SKU: 10182
Timber Floor Laying SWMS 10182-4 Video

Other Details

PDF Download:
timber_floor_laying_swms_10182_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Timber Floor Laying Safe Work Method Statement Scope:

This pre-filled Safe Work Method Statement (SWMS) outlines the generic job steps, hazards and controls associated with the installation of timber flooring (including direct stick to structural ply, direct stick to concrete with moisture seal and floating floor with underlay).  This does not include sanding, sealing and polishing tasks. 

Job Steps Covered in Timber Floor Laying SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Assess onsite conditions
  4. Work area set up
  5. Pickup/Delivery of materials and mobile plant
  6. Laying plastic or underlays
  7. Fixing plywood subfloor / battens
  8. Spreading adhesives
  9. Fixing timber flooring
  10. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...