Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Weed Control (Herbicides) SWMS 10295-5

Weed Control (Herbicides) SWMS 10295-5

Product SKU: 10295
Weed Control (Herbicides) SWMS 10295-5 Video

Other Details

PDF Download:
weed_control_herbicides_swms_10295-5_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • A Logo can easily be added
  • Add or Delete information
  • Instruction on customising provided
  • Receive SWMS via Email in 30 minutes or less!
  • Complies with current legislation in all Australian States/Territories and New Zealand
  • Support provided during business hours
  • Supplied in Microsoft Word format
  • Pay once and use it for multiple jobs - NO subscriptions!

Weed Control - Herbicides Safe Work Method Statement Scope:

This SWMS covers chemical weed control involving the use of herbicides. The method of application is foliar spraying, where the herbicide is diluted with water or diesel and using a hose and handgun spray over the foliage (back pack or vehicle mounted pump). A spray plan is included.

Job Steps Covered in Weed Control - Herbicides SWMS: 

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Training and Capabilities
  3. Travel to, from & between sites
  4. Assess onsite conditions
  5. Prepare intended work site
  6. Conduct visual pre-inspection of equipment
  7. Mixing / Decanting
  8. Weed Spraying
  9. On Completion


godigital-digitaljsa-bannerforswmspages-v3.png
 

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...