Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Heights SWMS Pack 10

Heights SWMS Pack 10

Product SKU: 50150
Heights SWMS Pack 10 Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Delivered via Email
  • Complies with current legislation in all States and Territories
  • Fully customisable so you can add your logo and any site specific details
  • Customising instructions provided
  • Delivered via email for instant download
  • You must have Microsoft Word or iAuditor to use this template

Heights Safe Work Method Statement Pack

This Safe Work Method Statement (SWMS) pack contains ten (10) SWMS in total. Each SWMS contained within the Height Safe Work pack includes a comprehensive outline of the job steps, general hazards and controls associated with work at heights involving elevated work platforms (EWP), scaffold, rope access, ladders and swing stages.

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System. 

The ten (10) SWMS included in this pack are:

All SWMS in the Heights SWMS pack address:

  • High Risk Construction Work
  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE
  • Job Steps
  • Potential Hazards
  • Control Measures
  • Emergency Response Procedures
  • Legislative References
  • Employee sign off section
  • Review & Monitoring
  • Falls Emergency Rescue Plan Tool (included in some SWMS)

swmsformats.png 

app-store-badge.png       google-play-badge.png

 

For works carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of the SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking. Prior to each new activity, the SWMS must be reviewed and revised to ensure it applies to the high risk construction work and the actual site you are working at.

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

RRP:
$799.50
$549.00

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...