Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Fencing -  Stranded Wire SWMS

Fencing - Stranded Wire SWMS

Product SKU: 10352
Fencing - Stranded Wire SWMS Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 14 March 2014

TheWire-Stranded Fencing Safe Work Method Statement (SWMS) is a comprehensive procedure outlining the safety steps for the installation of Wire-stranded fencing.

This Work Method Statement (WMS) is ready to use and is not a blank template. Simply add your company details, ABN, and include any site specific details or risks and make it specific to the task at hand. It is then ready for printing and to be incorporated as part of your overall WHS System.

It provides guidance on the installation of Wire-stranded fencing. This includes constructing fences for livestock control and other purposes.

Covered in this SWMS is delivery of materials, line clearing (earthworks), installation of strainer & running posts, run and strain Wire-stranded (either plain or barbed Wire-stranded), construct and hang gates.

Companion SWMS should include: Telescopic Post Driver, Bite and Sting Prevention, Remote- isolated work

This SWMS does not replace dedicated SWMS specifically relating to the operation or transport of any powered mobile plant.

Main Hazards include:

  • Crushing injury
  • Collision with other mobile plant or pedestrians
  • Entanglement
  • Eye injury
  • Lacerations 

The Fencing - Wire-stranded Work Method Statement can be used as part of your WHS inductions, for Tool box talks or tender applications.

This SWMS includes:

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Loading/Unloading & Transport
  • Pre-Operational Inspection
  • Operation - Clear Fence Line
  • Operation - Mark Out Fence/Dig Post Holes
  • Operation - Posts and Pickets
  • Operation - Wire-stranded/Straining
  • Operation - Gates
  • Working near watercourses
  • Clean Up
  • Maintenance
  • Emergency Procedures
  • Review
  • References

Related Products:

  • Manual Handling - Hazardous Manual Tasks
  • LOTO - Lock Out Tag Out
  • Trucks - Loading/Unloading
  • Auger
  • Contact with Utilities

Operation – Clear Fence Line:

Clear fence line. Ensure:

  • SWMS for machine operation in place and followed
  • All relevant workers are fully briefed and conversant with proposed work activity.
  • Complete an inspection of the intended / proposed work area and identify any specific hazards and relevant controls.
  • Operator completes a pre-work inspection of the machine prior to earthwork activities commence.
  • Create a flat profile with minimal soil disturbance where possible to limit erosion
  • Ensure all workers stay clear of operating machinery, in particular stay clear of blind spots in operator’s vision at all times
  • Ground workers are aware of wildlife disturbed by clearing operation. e.g. snakes
Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...