Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Pest Control - Termite & Ant Eradication SWMS

Pest Control - Termite & Ant Eradication SWMS

Product SKU: 10265
Pest Control - Termite & Ant Eradication SWMS Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via Email
  • Complies with current legislation in all States and Territories
  • Instant Download delivered via email
  • MS Word format for easy customisation/editing
  • Downloading and Customising Instructions provided
  • Assists with compliance requirements for WHS inspections
  • Review Date: 31 July 2014

The Pest Control- Termites & Ants Safe Work Method Statement (SWMS) is a comprehensive document outlining the safety steps, main hazards, risks and controls associated with the high risk activity of working in pest control. This SWMS covers termite and ant eradication using liquid and dust insecticides (containing hazardous substances such as fibronel and formaldehyde) in established premises and soil treatments for new structures.

The effects of pesticides on humans can vary from skin, stomach, eye and lung irritation, to damage to liver, kidneys and nervous system. Symptoms can be mild or severe enough to be fatal and depend on the chemicals used. Main routes of exposure include absorption (skin/eye), inhalation and ingestion (through eating/smoking without washing hands after using).

This SWMS includes: 

  • PPE
  • Safety Notes
  • Planning
  • Preparation
  • Pre-Operational Inspection
  • Operation
  • Maintenance
  • Emergency Procedures
  • Review
  • References
  • Employee sign off section
  • Hierarchy of Controls
  • Risk Assessment Matrix

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details, ABN, and include any site specific details or risks ensuring it is specific to the task at hand. It is then ready for printing and inclusion in your overall WHS System.

Product details:

  • Written by ex WHS inspectors
  • Easy customisation with MS Word format (NOT PDF)
  • Risk ratings before and after control measures
  • Provides a framework for training workers
  • Can be used as part of tender applications, WHS inductions, and Toolbox talks

Related Items:

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...