Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Tilt Tray Truck – Loading - Unloading - Heavy Machinery - Containers SWMS

Tilt Tray Truck – Loading - Unloading - Heavy Machinery - Containers SWMS

Product SKU: 10268
Tilt Tray Truck – Loading - Unloading - Heavy Machinery - Containers SWMS Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download Delivery
 
  • Review Date: 14 March 2014

The Safety Procedure includes:

  • Personal Qualifications and Experience
  • Site Awareness
  • Pre-Start Daily Checks
  • Preparation - General
  • Shipping Containers
  • Load Binders
  • Loading By Forklift
  • General Maintenance
  • Risk Ratings
  • MS Word Format
  • This Is Not A Blank Template
  • Version 4.0

General Tilt Tray Truck Safety Information:

The nine page Safe Work Procedure outlines the Safety Steps required to Load and Unload Machinery onto a Tilt Tray Truck Safely.

This Safety Procedure or Work Method Statementhas been developed for employers to be able to give direct instructions on how to Load and Unload onto a Tilt Tray Truck Safely according to the NSW Legislation. The document can be used as part of anInduction Process, submitted with a tender or simply implemented into your existing OHS System.

Additional Safety Information for Loading and Unloading a Tilt Tray Truck

When Loading/Unloading a Tilt Tray:

  • Check for uneven or sloping ground conditions. - Load can slip while being (un)loaded.
  • Ensure their is adequate lighting and the weather conditions are suitable.
  • Regularly check that the links on the chains have not been stretched, twisted, or are broken/bent.
  • Ensure that all webbing straps are free from cuts, any damage to the seems, and have not been snagged.
  • Ensure that the tilt tray truck is positioned in front of the equipment to be loaded
Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


Site Safety Plans Special
Save with 30% off Site Safety Management Plans.

Add coupon code SSMP30 at checkout.

You May Also Need...