Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote or call 1300 306 604

1300 306 604

Mitre / Drop Saw SOP 60130-2

Mitre / Drop Saw SOP 60130-2

Product SKU: 60130
Mitre / Drop Saw SOP 60130-2 Video
  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
Instant Download via email
  • Provides a step-by-step safe work process of operating an Mitre / Drop Saw (Metal Cutting) 
  • Communicates the preferred way to safely operate an Mitre / Drop Saw (Metal Cutting) 
  • Can assist in ensuring workers are adequately trained
  • Provided in Microsoft Word for easy customisation/editing
  • Includes a Risk Assessment Form

Enhance your existing workplace safety systems with Safe Operating Procedures.

The Mitre / Drop Saw (Metal Cutting) Safe Operating Procedures (SOP) or Safe Work Procedures (SWP) provides a way for your business to outline step-by-step safe processes for operating a Mitre / Drop Saw (Metal Cutting) safely. SOPs are ideal in:

  • ensuring workers recognise and manage associated hazards and risks involved
  • providing a training document for workers both prior to and during the operation of the mitre / drop saw (metal cutting) 

SOP Content:

  • Management Commitment and Approval
  • PPE
  • Hazards & Risks
  • Precautions
  • Pre-Operation Inspection
  • Operation Sequence
  • Maintenance/Cleaning
  • Includes a Risk Assessment Form

Ready to Use

Save time with our pre-filled, fully customisable templates. Simply add your company details and read the document to ensure all elements are relevant to your business, conduct a risk assessment using the Risk Assessment Form provided and make amendments as required. It is then ready for use as a training tool and as a point of discussion at OHS/WHS/Tool Box Talk meetings.

Write your own product review

Product Reviews

This product hasn't received any reviews yet. Be the first to review this product!



View Cart

You May Also Need...