Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Concrete Tilt-up Panels (Precast Panels) SWMS 10399-5

Concrete Tilt-up Panels (Precast Panels) SWMS 10399-5

Product SKU: 10399
Concrete Tilt-up Panels (Precast Panels) SWMS 10399-5 Video

Other Details

PDF Download:
Concrete Tilt-Up (precast panels) SWMS 10399-5_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Download via Email on order completion.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Concrete Tilt-up Panels (Precast Panels) SWMS | Safe Work Method Statement

This Concrete Tilt-up Panels (Precast Panels) Safe Work Method Statement (SWMS) outlines the general safety steps, main hazards and controls associated with the general safety of carrying out work that involves the casting of tilt-up/precast concrete panels. 

This SWMS includes formwork, steel fixing, concrete works and exposure to Respirable Crystalline Silica (RCS) dust.

This SWMS does not cover the lifting of tilt-up/precast panels into place.

Job Steps Covered in Concrete Tilt-up Panels (Precast Panels) SWMS:

(includes potential hazards and control measures)

  1. Planning & Preparation
  2. Temporary Casting Bed Design
  3. Concrete Panel Design
  4. Training & Capabilities
  5. Arrival & Assess On-site Conditions
  6. Work Area Set-up
  7. Laying Temporary Casting Beds
  8. Erecting Formwork
  9. Powder Actuated Tools
  10. Applying Bond Breakers/Release Agents
  11. Setting Steel Reinforcement/Lifting
  12. Tying Steel Reinforcement
  13. Placing & Finishing Concrete
  14. Removing/Stripping Formwork
  15. On Completion

For work carried out on a regular basis a generic SWMS may be prepared and used for those work activities.

Remember: The content of a SWMS should be refined over time and include consultation with workers and other persons conducting a business or undertaking.

Prior to each new activity, each SWMS must be reviewed and revised to ensure they apply to the current work activities and the actual site you are working at.

Go Digital - JSA and SWMS Integration

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...