Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604
This Glass Panel Installation (From Swing Stage) Safe Work Method Statement (SWMS) outlines the safety steps, general hazards and controls associated with the use of suspended scaffold systems to remove and Install glass window panels.
Included in this SWMS is the planning and preparation, training, pre-start and operational controls associated with the task.
This SWMS also includes a ‘Swing stage pre-use checklist’ and a ‘Falls Emergency Rescue Plan’.
(includes potential hazards & control measures)
Instant Document Delivery via Email
FREE Current OHS Legislation & Codes of Practice Reference List (Value $7.95)
For work carried out on a regular basis a generic Safe Work Method Statement (SWMS) may be prepared and used for those work activities.
Remember: The content of a Safe Work Method Statement (SWMS) should be refined over time and include consultation with workers and other persons conducting a business or undertaking.
Prior to each new activity, each Safe Work Method Statement (SWMS) must be reviewed and revised to ensure they apply to the current work activities and the actual site you are working at.
We're here to help if you need us!
Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au
SWMS Frequently Asked Questions | Helpful Video Tutorials