Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Glass Panel Installation (From Swing Stage) SWMS 10626-1

Glass Panel Installation (From Swing Stage) SWMS 10626-1

Product SKU: 10626
Glass Panel Installation (From Swing Stage) SWMS 10626-1 Video

Other Details

PDF Download:
Glass Panel Installation (from swing stage) SWMS 10626-1_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Glass Panel Installation (From Swing Stage) SWMS | Safe Work Method Statement

This Glass Panel Installation (From Swing Stage) Safe Work Method Statement (SWMS) outlines the safety steps, general hazards and controls associated with the use of suspended scaffold systems to remove and Install glass window panels.

Included in this SWMS is the planning and preparation, training, pre-start and operational controls associated with the task. 

This SWMS also includes a ‘Swing stage pre-use checklist’ and a ‘Falls Emergency Rescue Plan’.

Job Steps Covered in Glass Panel Installation (From Swing Stage) SWMS:

(includes potential hazards & control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Implement a Falls Emergency Rescue Plan
  4. Assess On-site conditions
  5. Work Area Set-up
  6. Pre Operational Inspection
  7. Working on Suspended Scaffold
  8. Removal/Replacement of Glass Panels
  9. On Completion

Glass Panel Installation (From Swing Stage) Safe Work Method Statement Includes:

  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE Requirements
  • Emergency Response
  • Emergency Evacuation Procedure

Instant Document Delivery via Email 

FREE Current OHS Legislation & Codes of Practice Reference List (Value $7.95)

For work carried out on a regular basis a generic Safe Work Method Statement (SWMS) may be prepared and used for those work activities.

Remember: The content of a Safe Work Method Statement (SWMS) should be refined over time and include consultation with workers and other persons conducting a business or undertaking.

Prior to each new activity, each Safe Work Method Statement (SWMS) must be reviewed and revised to ensure they apply to the current work activities and the actual site you are working at.

Go Digital - JSA and SWMS Integration

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...