Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Heights (Roof Edge Protection) SWMS 10228-6

Heights (Roof Edge Protection) SWMS 10228-6

Product SKU: 10228
Heights (Roof Edge Protection) SWMS 10228-6 Video

Other Details

PDF Download:
Height Roof Edge Protection SWMS_10228-6_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Heights (Roof Edge Protection) SWMS | Safe Work Method Statement

This Heights (Roof Edge Protection) Safe Work Method Statement (SWMS) outlines the safety steps, general hazards and controls associated with installation, use and subsequent dismantling of roof edge protection systems.

This SWMS also includes a Falls Emergency Rescue Plan Tool.

This SWMS does not cover the specific set-up of height access equipment.

A dedicated SWMS will be required for the set-up/erection of height access equipment such as Mobile and Fixed Scaffolds, Elevated Work Platforms etc.

Job Steps Covered in Heights (Roof Edge Protection) SWMS:

(includes potential hazards & control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Implement a Falls Emergency Rescue Plan (if using harness)
  4. Arrival at Site
  5. Work Area Set-up
  6. Fixing Edge Protection
  7. Handover
  8. Dismantling Edge Protection
  9. On Completion

Heights (Roof Edge Protection) Safe Work Method Statement Includes:

  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE Requirements
  • Emergency Response
  • Emergency Evacuation Procedure

Instant Document Delivery via Email 

FREE Current OHS Legislation & Codes of Practice Reference List (Value $7.95)

For work carried out on a regular basis a generic Safe Work Method Statement (SWMS) may be prepared and used for those work activities.

Remember: The content of a Safe Work Method Statement (SWMS) should be refined over time and include consultation with workers and other persons conducting a business or undertaking.

Prior to each new activity, each Safe Work Method Statement (SWMS) must be reviewed and revised to ensure they apply to the current work activities and the actual site you are working at.

Go Digital - JSA and SWMS Integration

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...