Loading... Please wait...

Need a customised SWMS package? Contact us for a free quote. Call 1300 306 604

1300 306 604

Make Safe (Secure Ceilings) SWMS 10582-2

Make Safe (Secure Ceilings) SWMS 10582-2

Product SKU: 10582
Make Safe (Secure Ceilings) SWMS 10582-2 Video

Other Details

PDF Download:
make_safe_secure_ceilings_swms_10582-2_SAMPLE.pdf


  • Product Description
  • Product Reviews
  • View Sample
  • Video Tutorials
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Supplied in Microsoft Word format.
    • Only pay once (no subscriptions required).

Make Safe (Secure Ceilings) SWMS | Safe Work Method Statement

This Make Safe (Secure Ceilings) Safe Work Method Statement (SWMS) provides guidance on making premises temporarily secure after a ceiling has fallen.

This SWMS covers the removal and disposal of debris, securing any remaining ceiling and applying black plastic to the joists for weather proofing.

This SWMS is created in response to the needs of first respondents for ‘making safe’ tasks after an emergency event.

As such, this SWMS may refer to additional high-risk SWMS for further detail.

Job Steps Covered in Make Safe (Secure Ceilings) SWMS:

(includes potential hazards & control measures)

  1. Planning & Preparation
  2. Training & Capabilities
  3. Arrival & Assessment of Site
  4. Remove & Loading Debris
  5. Securing Ceiling & Plastic to Joists
  6. On Completion
  7. Unloading at Landfill

Make Safe (Secure Ceilings) Safe Work Method Statement Includes:

  • Risk Assessment Matrix
  • Hierarchy of Controls
  • PPE Requirements
  • Emergency Response
  • Emergency Evacuation Procedure

Instant Document Delivery via Email 

FREE Current OHS Legislation & Codes of Practice Reference List (Value $7.95)

For work carried out on a regular basis a generic Safe Work Method Statement (SWMS) may be prepared and used for those work activities.

Remember: The content of a Safe Work Method Statement (SWMS) should be refined over time and include consultation with workers and other persons conducting a business or undertaking.

Prior to each new activity, each Safe Work Method Statement (SWMS) must be reviewed and revised to ensure they apply to the current work activities and the actual site you are working at.

Go Digital - JSA and SWMS Integration

We're here to help if you need us!

Call 1300 306 604 9am to 5pm, Monday to Friday | Email: info@safetyculture.com.au

SWMS Frequently Asked Questions | Helpful Video Tutorials

Write your own product review

Product Reviews


This product hasn't received any reviews yet. Be the first to review this product!

$79.95

PLUS GST

View Cart


You May Also Need...