Concrete Pool Construction Safe Work Method Statement

  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Concrete Pool Construction Safe Work Method Statement

This Concrete Pool Construction Safe Work Method Statement (SWMS) covers hazards and controls associated with the construction of in-ground concrete pool shells.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers
  • Working at depths greater than 1.5 Metres, including tunnels or mines
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hot Work, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Swimming Pool Risk Assessment 

Before starting to dig the pool, it's essential to have a clear understanding of the risks involved.

Make sure you're using the safest construction methods with our included Risk Assessment matrix. It'll help you identify and avoid potential dangers during the build process.

Our easy to use risk matrix can be used to modify your SWMS for every project

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Concrete Pool Construction SWMS:

(includes potential hazards & control measures)

  1. Provide Training on the Health Effects Associated with RCS
  2. Planning
  3. Working Outdoors
  4. Arrival On-site & Assess On-site Conditions
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Delivering Materials, Excavation, Concrete Delivery
  10. Working with Powered & Non-powered Tools
  11. Hazardous Substance/Chemical Use
  12. Setting-out/Profiling Building Lines
  13. Excavation
  14. Installing Pipework
  15. Setting Steel & Formwork
  16. Pouring Concrete
  17. On Completion
  18. Emergency Response
  • Instant Document Delivery via Email.
    • Add your logo easily.
    • Add or delete information to any SWMS template.
    • Customisation instructions provided.
    • Complies with Australian & New Zealand legislation.
    • Microsoft Word Format (Fully editable).
    • Only pay once (no subscriptions required).

Concrete Pool Construction Safe Work Method Statement

This Concrete Pool Construction Safe Work Method Statement (SWMS) covers hazards and controls associated with the construction of in-ground concrete pool shells.

This SWMS covers High-Risk Construction Work (HRCW) controls related to:

  • Mobile plant movement
  • Pressurised gas distribution mains or piping chemical, fuel or refrigerant lines energised electrical installations or services
  • Involves a risk of a person falling from 2m or more, including work on telecommunications towers
  • Working at depths greater than 1.5 Metres, including tunnels or mines
  • Work carried out adjacent to a road, railway or shipping lane, traffic corridor

Additional controls are included for Electrical Equipment, Elevated Levels, Slips, Trips & Falls, Hazardous Substances, Hot Work, Hazardous Manual Tasks, Outdoor Work, Silica Dust & Environmental Considerations.

Swimming Pool Risk Assessment 

Before starting to dig the pool, it's essential to have a clear understanding of the risks involved.

Make sure you're using the safest construction methods with our included Risk Assessment matrix. It'll help you identify and avoid potential dangers during the build process.

Our easy to use risk matrix can be used to modify your SWMS for every project

Comes with a complimentary copy of the Legislation & Codes of Practice Reference List valued at $19.95

Job Steps Covered in Concrete Pool Construction SWMS:

(includes potential hazards & control measures)

  1. Provide Training on the Health Effects Associated with RCS
  2. Planning
  3. Working Outdoors
  4. Arrival On-site & Assess On-site Conditions
  5. Work Area Set-up
  6. Environment
  7. Housekeeping
  8. Manual Tasks
  9. Delivering Materials, Excavation, Concrete Delivery
  10. Working with Powered & Non-powered Tools
  11. Hazardous Substance/Chemical Use
  12. Setting-out/Profiling Building Lines
  13. Excavation
  14. Installing Pipework
  15. Setting Steel & Formwork
  16. Pouring Concrete
  17. On Completion
  18. Emergency Response
PDF Download
PDF File

Frequently Asked Questions

Safe Work Method Statement (SWMS) FAQ's. View
OHS/WHS Management Systems FAQ's. View
Quality Management System (QMS) FAQ's. View
New Zealand FAQ's. View
Custom Branding FAQ's. View